Hi,
I find NCrunch absolutely wonderful and indispensible tool for my everyday work. There's one gotcha though - we have around 50 projects in a solution, so obviously re-buidling projects takes alot of times. What i've thought would improve things is to add an ability to control the delay of how NCrunch reacts to code changes.
Ideally, this could be configurable setting. Let's say 5 would mean NCrunch would start building only after there are no changes in 5 seconds. If there are, such as user is still typing code, don't rebuild, as that is pointless, since the code is changing already.
This would greatly improve user experience. Would it be possible to add this?
thanks.
Darius