v2.1.0.2
I have a couple of engine modes which of some I often toggle between. I would therefore like to reorder the order of them (and maybe add hotkey option for them?) so I quickly can have my favorite mode always with keyboard shortut 1 in menu, next best 2 etc.
Feature Suggestions
Possibility to change order in Available Engine Modes
Started by GreenMoose on 7,990 views
Remco NCrunch Developer
#4918
10 Dec 2013 12:29 UTC
This makes sense. Probably move up/down buttons on the customisation mode dialog should do the trick here. Thanks for the suggestion :)
Related minor issue: When creating 10 engine modes or more, the shortcut key "1" will be duplicated.
Post a reply
Log in to reply.